Project Subject Works were executed to repair a 475-linear-meter railway line and strengthen the production-technical infrastructure within the territory of “Baku Steel Company” LLC.
Works Performed Within the framework of the project, the construction of the “Bilajari Wheel Workshop” building was carried out, along with repair and restoration works of existing industrial and auxiliary facilities. All works were executed in accordance with technical norms and safety requirements.
Results Achieved
Increased operational capability of the railway infrastructure.
Optimization of maintenance and repair processes.
Enhanced functionality of industrial facilities.
Long-lasting production infrastructure.